Blog

How long does it take to build a small business website?

A shop owner wrote to me on a Monday and said she needed the site by Friday. She had a market stall on Saturday and wanted the address on a page she could point people to. I told her the honest thing: a landing page in five days, yes — a full website, no.

By Jawad Ali · 13 November 2026 · Updated 13 November 2026

A cup of coffee on an open planner with handwritten goals for the month

She took the landing page. It had her stall, her hours, her phone number, and a form for orders, and it was live on Friday morning. Three months later she came back for the full site, and the landing page became its home page. The deadline was real, and the right answer was the smaller build done well, not the bigger build rushed. This article tells you how long each size of site actually takes, where the days go, and what usually makes a project run late.

How long does a website take to build?

Starter takes 15 days, Business 20, Premium 25 — a landing page, 5–7. Those are working days from the day you agree the price and the pages, not from the first message. The first message starts a conversation; the clock starts when you say yes to the price and the date, and I have what I need to begin.

The days are not all building. The first part is design: I draw every page in Figma first, so you see the finished look before I build a single page. That takes a few days, and it is the part that saves the most time later, because changing a drawing is quick and changing a built page is slow. The second part is the build itself: page by page, with a working contact form and the search basics set up as I go. The third part is the check: I open every page on a phone and a laptop, click every link, and send a test enquiry through the form to make sure it reaches you.

What slows a website down?

The most common delay is the words and the photos. I have had a project sit for three weeks because the owner was waiting for a photographer, and another sit for a fortnight because the text for one page kept coming back as "I will send it tomorrow". The build cannot start properly without them: I can draw the layout, but I cannot finish a page whose words do not exist yet. If you do not have everything, send what you have — I will tell you what is missing before anything starts, and I can write the words from a short call if that is faster for you.

The second delay is decisions. A project moves at the speed of its answers. When I send you the design and ask what to change, a reply in a day keeps the project on its date; a reply in a week moves the date by a week. That is not a complaint — you are busy running a business — but it is the honest arithmetic of it. The third delay is extra pages. A page added halfway through needs the same drawing, writing, building, and checking as any other page, so it adds days, and an extra page adds $100. Decide the pages at the start and the date holds.

How long does a landing page take?

A landing page takes 5–7 days because it is one page with one job. I draw it, you mark your changes, I build it, and I check it on a phone and a laptop. It is the right choice when the deadline is real and the job is one offer: a market stall on Saturday, an advert starting Monday, a seasonal service that starts next week.

What a landing page cannot do in five days is become a full website. If you need seven pages, the honest answer is fifteen to twenty-five days, and anyone who promises seven pages by Friday is either cutting the checks or cutting the design. The checks are the part you never see and the part that matters most: the form that must reach you, the page that must open on a phone, the link that must go somewhere.

Can I make my website faster to finish?

Yes, in three ways. First, send the words and photos with your first message, or as soon as you can after it. A project with everything in hand on day one starts on day one. Second, answer the design quickly. When I send the Figma drawings, read them the same evening if you can, and mark every change at once rather than one change a day. Third, keep the pages fixed. Adding a page in the middle adds days; adding it after launch is a separate small job, and it does not hold up the rest of the site.

One thing does not make a site faster: skipping the design step. I have seen sites built straight from a brief, without a drawing to approve, and they always come back for more changes than a site drawn first. The drawing is where the big decisions happen — what goes where, what the visitor sees first, what the page asks them to do. Make those decisions on paper and the build runs straight.

What happens after launch?

Launch is not the end of the work. Before the site goes live, I read every page once more, click every link, and send a test enquiry through the form. After launch, the support days in your package cover fixes and small changes: 14 days on Starter, 30 on Business, 60 on Premium. If something breaks in that time, I fix it. After the support days end, the care plans take over — $49, $99, or $199 a month — with updates, backups, and hours of changes. A site that is looked after stays fast and keeps working; a site that is left alone slowly stops doing its job.

If you have a date in mind, tell me the date and the pages you need, and I will say plainly whether it fits. A custom website takes 15, 20, or 25 days depending on the package, and the Pricing page lists the timelines for each one, so you can match the date to the size before you write to me.

Got a date in mind?

If the date matters more than the pages, say so in the quote form — I will tell you what fits in the time you have.

Get a Quote

Keep reading

All articles